JPH0449608B2 - - Google Patents
Info
- Publication number
- JPH0449608B2 JPH0449608B2 JP60047555A JP4755585A JPH0449608B2 JP H0449608 B2 JPH0449608 B2 JP H0449608B2 JP 60047555 A JP60047555 A JP 60047555A JP 4755585 A JP4755585 A JP 4755585A JP H0449608 B2 JPH0449608 B2 JP H0449608B2
- Authority
- JP
- Japan
- Prior art keywords
- slope
- embankment
- work
- net
- sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4755585A JPS61207723A (ja) | 1985-03-12 | 1985-03-12 | 盛土の斜面安定化工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4755585A JPS61207723A (ja) | 1985-03-12 | 1985-03-12 | 盛土の斜面安定化工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS61207723A JPS61207723A (ja) | 1986-09-16 |
JPH0449608B2 true JPH0449608B2 (en]) | 1992-08-12 |
Family
ID=12778423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4755585A Granted JPS61207723A (ja) | 1985-03-12 | 1985-03-12 | 盛土の斜面安定化工法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61207723A (en]) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0786234B2 (ja) * | 1988-12-15 | 1995-09-20 | 清水建設株式会社 | 盛土の造成方法 |
KR20040011787A (ko) * | 2002-07-30 | 2004-02-11 | 김동민 | 식생 보강토 옹벽의 시공법 및 그 구조물 |
KR100520285B1 (ko) * | 2002-12-04 | 2005-10-11 | 최춘식 | 고강도 토목섬유를 이용한 제방 층다짐 보강공법 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5115503A (ja) * | 1974-07-30 | 1976-02-07 | Kyokado Eng Co | Tsuchikozobutsunarabinitsuchikozobutsunokochikuho |
JPS5211605A (en) * | 1975-07-17 | 1977-01-28 | Tekken Constr Co | Banking for strengthening face of slope and method of executing same |
JPS5952024A (ja) * | 1982-09-20 | 1984-03-26 | Mitsui Petrochem Ind Ltd | 垂直盛土用構造物 |
-
1985
- 1985-03-12 JP JP4755585A patent/JPS61207723A/ja active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS61207723A (ja) | 1986-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5948525A (ja) | 補強材及び垂直盛土用構造物 | |
JP3714885B2 (ja) | 法面、壁面、岸面等の保護構造 | |
JP2001064937A (ja) | 土木工事用ふとんかごとこれを用いた保護工および中詰材の充填方法。 | |
JPS6325137B2 (en]) | ||
JPS61155516A (ja) | 斜面安定工法および補強材 | |
JPH0449608B2 (en]) | ||
KR100658441B1 (ko) | 쓰레기 매립장 침출수 여과매트 | |
JPH11269860A (ja) | 複合改良地盤構造 | |
JPH05171652A (ja) | 斜面安定工法 | |
JP3431783B2 (ja) | 法面、壁面等の保護構造 | |
JP4947847B2 (ja) | 補強盛土用シート | |
JP2711477B2 (ja) | 盛土の補強構造 | |
CN222834867U (zh) | 一种具有排水功能的土工格栅 | |
JP3362243B2 (ja) | 土木工事用網状収納体 | |
JPH02164922A (ja) | 盛土の造成方法 | |
JP4331880B2 (ja) | 立体網状体およびその製造方法 | |
JPH02209522A (ja) | 土構造物の構築方法 | |
JPH03208915A (ja) | 補強された盛土 | |
JP7352605B2 (ja) | 土木用又は建築用シートの施工方法及び土木用又は建築用シートの固定方法 | |
CN213328496U (zh) | 用于道路的格栅复合土工布 | |
JPS62268413A (ja) | 地盤の改良・補強構造体 | |
JPH054494B2 (en]) | ||
JP3172449B2 (ja) | 透水性ネットを用いた土木工法 | |
JPS63176524A (ja) | 盛土 | |
JPH0381411A (ja) | 地盤補強用複合補強材 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EXPY | Cancellation because of completion of term |